The road is the raw material. 

Antigua and Barbuda has a stockpile problem and a pavement problem. Crumb rubber from end-of-life tyres answers both: a waste stream diverted from the landfill, and an asphalt that holds up better in heat, salt and rain.

01
Rubberised corridors
02
Cook's Landfill diversion
03
Island-wide delivery
The situation

A small island, a long road network, and millions of tyres. 

The national road network runs to roughly 1,250 kilometres, of which about 820 kilometres are paved. Much of it was laid decades ago and has had no substantial rehabilitation in the last ten to twenty years. In a climate of intense UV, salt air and tropical downpours, that shows up quickly as rutting, cracking and edge failure.

At the same time, Cook's Landfill — the country's only official waste site — receives up to 1,500 tyres a day. Estimates of the accumulated stockpile range from three to five million tyres. They are difficult to compact, impossible to bury safely at volume, and a persistent fire and mosquito risk. In 2011 a tyre fire at the site burned for more than fourteen hours.

These are not two separate problems. One is the feedstock for the other.

0 km
National road network

Approximately 817 km paved, 436 km unpaved.

0/day
Tyres arriving at Cook's Landfill

Government post-Cabinet briefing, February 2026.

0M
Tyres estimated in the stockpile

NSWMA estimates range from 3 to 5 million.

The material

Crumb rubber modified asphalt

End-of-life tyres are reduced to crumb rubber — a fine, consistent granulate — and blended into the bitumen binder. The rubber swells and reacts with the asphalt at temperature, producing a stiffer, more elastic binder that resists permanent deformation and fatigue.

Two production routes are used internationally. In the wet process, crumb rubber is blended into the binder before the mix is produced, at 15–20% by mass of binder. In the dry process, crumb rubber is added to the aggregate as a portion of the fine fraction. Wet-process binders generally deliver the greater durability benefit; dry-process mixes are simpler to produce with existing plant.

For an island programme, the practical answer is usually a hybrid: wet-process binder for surface courses on the primary network, dry-process mixes for secondary and access roads where plant and logistics are tighter.

01

Wet process

Crumb rubber digested into bitumen at 175–190°C. Higher binder viscosity, better rutting and fatigue performance.

02

Dry process

Crumb rubber dosed as aggregate. Lower capital intensity, useful where binder blending capacity is limited.

03

Terminal blend

Rubber pre-blended at a refinery or terminal and shipped as a ready binder. Simplest to specify, least flexible.

01Cross-section

What a rubberised pavement is made of.

A pavement is a load-spreading system, not a single surface. The rubber does its work in the top two layers; the base and sub-base do the rest.

Pavement cross-section0102030405CARRIAGEWAYPAVEMENT STRUCTURENOT TO SCALE · LAYER THICKNESSES INDICATIVE
01

Surface course

Thickness40–50 mm

Crumb rubber modified asphalt. The layer that takes traffic, UV and rain — and the one that benefits most from rubber's elasticity.

Performance

Why rubber earns its place in the mix.

Rubber-modified binders are among the most studied pavement materials in the world. The consistent findings are greater resistance to rutting and fatigue, slower age-hardening, and a quieter, better-gripping surface.

Indicative comparative index: crumb rubber modified surface course versus conventional dense-graded asphalt, compiled from published pavement studies. Not a specification and not a guarantee of field performance.

Rubber modifiedConventional
Rutting resistance92/ 70
Fatigue cracking resistance88/ 65
Ageing resistance85/ 62
Wet-weather skid resistance80/ 72
Ride comfort84/ 70
02From tyre to lane

Six stages, one material chain.

Every stage is a quality control point. Crumb that is not clean, consistently graded or correctly digested produces a binder that fails early.

  1. 01

    Recover

    Tyres are collected from Cook's Landfill, garages and partner drop-off points, then weighed and logged by source.

  2. 02

    De-wire

    Steel beads and belts are separated from the rubber. Recovered steel enters the metals market rather than the ground.

  3. 03

    Shred

    Tyre chips are reduced by ambient or cryogenic grinding. Ambient is cheaper; cryogenic gives a cleaner, finer crumb.

  4. 04

    Grade

    Crumb is screened to a consistent 30–80 mesh. Gradation control is what makes the binder behave predictably.

  5. 05

    Blend

    Crumb is digested into bitumen at temperature, with extender oils and stabilisers as required by the mix design.

  6. 06

    Pave

    The mix is laid and compacted with standard plant, then cored and tested against the acceptance criteria.

03Delivery model

Designed for island logistics, not a mainland site.

Corridor sequencing

Work is packaged by corridor rather than by parish, so plant moves once and the travelling public sees continuous improvement.

Drainage first

Every corridor is assessed for drainage before resurfacing. Rubber asphalt is durable, but no pavement survives standing water.

Salt and UV

Coastal exposure drives mix design: tighter air voids, polymer-rubber hybrid binders where warranted, and edge protection.

Containerised plant

Modular blending and shredding equipment can be shipped in standard containers and commissioned on island.

Local crews

Paving crews are trained and certified on the modified mixes, so the capability stays in the country after the contract ends.

Maintenance contracts

Performance-based maintenance spreads cost across the asset life and keeps accountability with the party that laid the surface.

Recycling

A recovery chain, not a disposal route.

A tyre is a composite: roughly 70% rubber by weight, 15% steel, and 15% textile, depending on the tyre class. A recovery programme that only produces crumb rubber is leaving value — and landfill volume — on the table.

World Changers approaches tyres as three material streams with three markets. Rubber becomes binder, moulded products and safety surfacing. Steel returns to the metals trade. Textile becomes fuel alternative or fibre fill. What remains is a fraction of the original volume, and none of it needs to be landfilled.

70%
Rubber by weight
15%
Steel by weight
15%
Textile by weight
Material split by weight
Crumb rubberBinder modifier, moulded mats, playground and equestrian surfacing, and rubberised asphalt for secondary roads.
70%
Recovered steelBead wire and belt steel baled and sold on. A clean, high-value stream that offsets processing cost.
15%
Textile fibreSeparated, densified and routed to fibre recovery or approved alternative-fuel users.
15%
Recovery programme
  • Community and garage drop-off points with published gate rates
  • Buy-back pricing that makes returning a tyre worth more than dumping it
  • Collection scheduling aligned to the landfill's intake
  • Local processing jobs — sorting, de-wiring, grading, baling
  • Annual published diversion figures
04Specification

What we specify, and what we test.

Indicative specification for a rubberised surface course. Final requirements are set by the project design and the client's engineer.

Binder
Crumb rubber modified bitumen, 15–20% rubber by mass of binderWet process unless the mix design specifies otherwise.
Crumb gradation
30–80 mesh (0.18–0.60 mm), screened and de-dustedGradation verified per lot before blending.
Mix design
Marshall or Superpave volumetric design, project-specificTraffic, climate and drainage determine the target air voids.
Compaction
Field density verified by core; acceptance against the specified targetRolling pattern set by trial section before production.
Testing
Binder viscosity and softening point, resilient modulus, indirect tensile strength, wheel trackingSampling frequency agreed in the quality plan.
Acceptance
Density cores, surface regularity, visual defect survey at handoverDefects liability period with agreed remedy times.
Sources & notes
  1. 01 · Road networkCaribbean Development Bank, Second Road Infrastructure Rehabilitation Project — appraisal report, 2017.
  2. 02 · Tyre volumesGovernment of Antigua and Barbuda, post-Cabinet press briefing, February 2026, as reported by Antigua News Room.
  3. 03 · Stockpile estimateNational Solid Waste Management Authority estimates, 2024–2026.
  4. 04 · Landfill fireOffice of the Director of Audit, Performance Audit of the National Solid Waste Management Authority, 2013.
  5. 05 · Landfill capacityBBC Worklife, 'Sun, sea and trash: the Caribbean islands struggling with managing waste', 2025.
Next · DevelopmentInterlock homesMagnesium-oxide panels, locked into a shell that is engineered for the hurricane belt.
Infrastructure

Have a corridor in mind?

Send us the road, the length and the condition. We will come back with a materials and delivery approach.

Antigua and Barbuda+1 268 724 7000
United States+1 917 682 7000
Based inAntigua and Barbuda · United States